Yeni duvarlara, yönetmeliğe uygun tam astar, ara kat ve son kat sistemi uygulanır.
We do not cut corners with fast 1-coat synthetic shortcuts. Every new stucco installation follows Florida Building Code Chapter 25 for 7/8" nominal total thickness.
Two distinct planes of heavy-duty weather barrier installed shingle-lap to direct any intruding moisture outward to the foundation weep screed.
Mechanically fastened into wall framing studs with corrosion-resistant screws. Includes zinc corner beads and control joints to manage expansion.
Troweled fully through lath keys and horizontally scored to provide mechanical interlocking keys for the subsequent coat. 48-hr moist cure.
Brought true to grounds and screeded flush to create a dead-flat, plumb exterior surface. Hydration-cured for maximum compressive strength.
The final visible texture layer (knockdown, sand-float, smooth or lace) with UV-stable pigments that never fade or chalk under Florida sun.
Yedi adım, tek ekip, duvara dokunmadan önce yazılı kapsam.
Fiyatlar şu anda güncelleniyor — aynı gün aralık için bizi arayın.
Hemen araUzmanlarımızdan bilgi almak için hasar fotoğraflarını gönderin veya net bir yazılı teklif için ücretsiz keşif randevusu alın.